|  大会开幕、闭幕 |  接见与会谈 |  WASER成立 |  学术活动 |  技术考察 |  论文集 |  媒体宣传      
·

张仁作题为《长江三峡工程泥沙问题》的主题报告

张仁(Ren ZHANG)SEDIMENT RESEARCH FOR THE THREE GORGES PROJECT ON THE YANGTZE RIVER SINCE 1993

  Abstract: This article addresses sediment research carried out for the Three Gorges Project since 1993, when the construction of the Project was formally started. Emphasis of the research has been placed on the solution of relevant problems arising from design and construction of various structures, including sedimentation problems in the Chongqing reach; layout of the upper lock approach channel and ways and means to mitigate its deposition; increasing reservoir capacity by optimizing reservoir operation; compensating depth of flow required by navigation below the Gezhouba Project caused by scouring; mitigation of adverse effects of erosion on the reach from Zhicheng to Jiangkou; and evaluating scour of the Jinjiang reach caused by releasing flows of low concentrations from TGP. In addition, reduction of the sediment load entering into the reservoir area of TGP in the recent years as well as that expected of the projected construction of large hydropower stations on the Jinsha River upstream of the TGP reservoir is also noted and discussed.


    (全文下载) Download(PDF)

 

 

|  大会开幕、闭幕 |  接见与会谈 |  WASER成立 |  学术活动 |  技术考察 |  论文集 |  媒体宣传      
    Previous page Next page Home page