Abstract
As the
largest hydropower project in the world, the Yangtze Three Gorges Project is
the key and backbone project for the management and development of the Yangtze
River. With a total storage capacity of 39.3 billion m3 and a normal
pool level of
After the
Yangtze Three Gorges Project was put into operation, a large amount of sediment
will deposit in the reservoir, which will result in serious scouring on the
riverbed in the downstream of the reservoir. Therefore, the sediment depositing
and scouring is one of the key technical issues in the construction of Three
Gorges Project. The government has paid high attention on the sediment issue in
the Yangtze Three Gorges Project, upon which a lot of human, physical and
financial resources have been inputted into prototype observation on the
sediment in the Three Gorges Project, while sediment research had been paid
high attention. Abundant information has been collected including water level,
discharge, suspended load, bed-load sediment, reservoir depositing, downstream
of the reservoir riverbed scouring, and river channel processing of the key
reaches, which facilitate the development of sediment subject of the Yangtze
River.
This paper
mainly briefs the process of demonstration as long as 70 years and prototype observation
on the sediment in the Three Gorges Project.
Keywords: The Three Gorges
Project, Hydrology and Sediment, Prototype Observation